Hotline: 0274 383 347
Thursday, 26-6-25 08:03:16

Economics

Hotline: 0274 383 347

PM demands special mechanisms for Noth - South high-speed railway project

Prime Minister Pham Minh Chinh on October 5 order specific and special mechanisms be devised for the North - South high-speed railway project so that procedures are streamlined and construction duration shortened.

He made the request while chairing a meeting between permanent Government members and ministries, sectors to discuss investment in the North - South high-speed railway project and the implementation of railway projects connecting with China.

The Ministry of Transport (MoT), together with other ministries and sectors, has studied high-speed railway models of many countries basing on which they proposed the North - South route of Vietnam should be 1,541km long, have a designed speed of 350km per hour, and comprise 23 passenger stations and five cargo ones. It should run through 20 provinces and cities, starting at Ngoc Hoi station in Hanoi and end at Thu Thiem station in Ho Chi Minh City. Total investment is estimated at 67.34 billion USD.

The MoT suggested that after the National Assembly (NA) approves the investment, bidding should be carried out to select an international advisory body while a survey to compile a pre-feasibility study report implemented in 2025 - 2026. Site clearance, contractor selection, and work on the sub-projects of the Hanoi - Vinh and Nha Trang - HCM City sections will be launched in late 2027. Meanwhile, the sub-projects of the Vinh - Nha Trang section will start in 2028 - 2029. The entire route is expected to be completed in 2035.

PM Chinh, who is also head of the State steering committee for key transport projects, stressed that the Noth - South high-speed railway project and the railway projects connecting with China hold critical importance to national development.

At the recent 10th session, the 13th Party Central Committee agreed in principle on investing in the North - South high-speed railway project, he noted, demanding ministries and sectors apply themselves to drafting this project to submit it to the Party Central Committee and the National Assembly for consideration, and propose the preparation of resources and other necessary conditions for implementation.

He said this railway will be amphibious, serving both socio-economic development and national defence - security. It must avoid large residential areas, be as straight and cost-saving as possible, and implemented in the fastest possible manner so as to be put into use soon to serve national development.

Besides, the route must be in conformity with the national and sectoral master plans, link with other means of transport like aviation and sea transport while connecting with domestic economic corridors and regional countries such as China, Laos, and Cambodia, he went on.

The Government leader also asked for reviewing total investment to ensure precision and considering specific and special mechanisms for this project, especially in terms of resource mobilisation, procedures, and policies on land, site clearance, and building materials in order to ensure that procedures are streamlined and construction duration shortened.

He pointed out the need to promoting cooperation with international partners to make use of financial sources, receive technologies transferred, train human resources, and improve governance capacity to guarantee the safest and most scientific and effective operations of the route.

At the meeting, PM Chinh also ordered the railway projects connecting Vietnam with China be accelerated, namely Lao Cai - Hanoi - Hai Phong, Hanoi - Lang Son, and Mong Cai - Ha Long - Hai Phong.

The Lao Cai - Hanoi - Hai Phong route is about 380km long and has an estimated investment of 11.6 billion USD. Passenger and cargo trains will run at 160km per hour.

About 156km long, the Hanoi - Lang Son route will be invested with about 6 billion USD in total. Both passenger and cargo trains on this route will also run at 160km per hour.

Meanwhile, the Mong Cai - Ha Long - Hai Phong is about 187km long and invested with 7 billion USD. Passenger and cargo trains will operate at 160km per hour and 120km per hour, respectively.

All these three railways will use a track gauge of 1,435mm./.

VNA

Vietnamese products grab spotlight at Algiers int’l fair 2025

Vietnamese goods are gaining international attention at the 56th Algiers International Fair (FIA 2025), held from June 23–28 in Algeria's capital.

OCOP programme hits milestone with 126 five-star products nationwide

The National Council for the Evaluation of OCOP Products on Tuesday announced the recognition of 47 new five-star-rated products under the One Commune One Product (OCOP) programme,

In-depth industrial development

In the first six months of 2025, the Index of Industrial Production (IIP) in Binh Duong province is estimated at increasing by 10.19% compared to the same period last year.

In-depth industrial development

In the first six months of 2025, the Index of Industrial Production (IIP) in Binh Duong province is estimated at increasing by 10.19% compared to the same period last year.

Establishing a framework for the reorganization of the global supply chain

In light of the global economy being influenced by various factors such as supply chain disruptions,

Opening doors for workers to own housing

With the strong support of the government, active participation from the banking system, and the attention of provincial leaders and businesses, access to social housing for workers and low-income individuals is widening.

Tan Uyen city enhances the inspection and enforcement of trade violations

In accordance with the directives of the Provincial Steering Committee for the Prevention of Smuggling, Trade Fraud,

Total tax revenue in Binh Duong reaches 63.7% of estimate

On June 23, Tax Department of Region XVI held a conference to review tax work for the first six months of 2025, outline tasks for the remaining six months, and honor exemplary enterprises.

Elevating development

Amid the current global economic landscape, which is being significantly impacted by shifts in supply chains, trade dynamics

Opening the way for auxiliary industries

The development of auxiliary industries not only serves the industrial production of Binh Duong and the entire country, but also aims at exports and integration into global value chains.

Enterprise - Brand

Company Social Media Net

Company VIETNAMNAY

Company HANEL MIROLIN

Company Keangnam - vina

Company HP Travel

Company Keloph