Hotline: 0274 383 347
Tuesday, 9-6-26 06:53:24

Economics

Hotline: 0274 383 347

Thuan An District promotes technical infrastructure for socio-economic development

 People’s Committee leaders have just checked up capital construction in Thuan An District which has been promoted by active leadership and lower prices of materials. However, obstacles still remain.

 

In 2010, total capital construction including traffic, technology and social wealth fare, is accounted for VND 339.9 billion mobilized from different sources.

 

By the end of May 2010, VND 138.1 billion was paid out to meet 40.6% of the year’s projection while handing-over amount was VND 134.3 billion or 39.51% of the projection. Accordingly, distribution value was VND 127.1 billion or 37.40% of the project. Estimation for the end of June 2010 showed that paying-out value will reach 58% with distribution value of VND 186.4 billion.

 

People’s Committee Standing Deputy Chairman Le Thanh Cung highly appreciated the results that were thanks to synchronized efforts and cooperation of the people and authority leadership.

 

Thuan An People’s Committee Deputy Chairman Dang Van Ba stressed on favorable conditions of leadership and materal prices for their promotion of construction.

 

Beyond from investment promotion for socio-economic development, local authority also concentrated on remodeling of urban area. In 2010, local authority will construct 25 new sites with over VND 30 billion of investment. Meanwhile, dredging has cost VND 11.11 billion and school facilities renew is expected to cost VND 4.9 billion. On the other hand, site clearance and compensation tasks were still slow. In the first 6 months of 2010, Thuan An authority has concentrated on listing and pricing of compensation costs at VND 24.8 billion for 252 construction profiles managed by the district. As for province-sponsored construction, some VND 13,458 billion was paid to 78 profiles affected by My Phuoc – Tan Van road construction while some VND 27.83 billion was paid to 23 profiles.

 

Thuan An People’s Committee Chairman Tran Thanh Liem confirmed remaining obstacles in terms of compensation, site clearance, and fluctuation of material prices. So as to remove the mentioned obstacles, he called for resolution by proposing to provincial People’s Committee measures for completion of projected plans. People’s Committee Standing Chairman praised up results of Thuan An Party Committee, authority, and people in the face of mingled advantage and disadvantage.

Reported by Duy Chi – Translated by Vi Bao

Tags:

Green development under local characteristics

With various industrial parks (IPs) already built or planned for future investment, Bau Bang district has identified green industry as its strategic path

Vietnamese products grab spotlight at Algiers int’l fair 2025

Vietnamese goods are gaining international attention at the 56th Algiers International Fair (FIA 2025), held from June 23–28 in Algeria's capital.

OCOP programme hits milestone with 126 five-star products nationwide

The National Council for the Evaluation of OCOP Products on Tuesday announced the recognition of 47 new five-star-rated products under the One Commune One Product (OCOP) programme,

In-depth industrial development

In the first six months of 2025, the Index of Industrial Production (IIP) in Binh Duong province is estimated at increasing by 10.19% compared to the same period last year.

In-depth industrial development

In the first six months of 2025, the Index of Industrial Production (IIP) in Binh Duong province is estimated at increasing by 10.19% compared to the same period last year.

Establishing a framework for the reorganization of the global supply chain

In light of the global economy being influenced by various factors such as supply chain disruptions,

Opening doors for workers to own housing

With the strong support of the government, active participation from the banking system, and the attention of provincial leaders and businesses, access to social housing for workers and low-income individuals is widening.

Tan Uyen city enhances the inspection and enforcement of trade violations

In accordance with the directives of the Provincial Steering Committee for the Prevention of Smuggling, Trade Fraud,

Total tax revenue in Binh Duong reaches 63.7% of estimate

On June 23, Tax Department of Region XVI held a conference to review tax work for the first six months of 2025, outline tasks for the remaining six months, and honor exemplary enterprises.

Elevating development

Amid the current global economic landscape, which is being significantly impacted by shifts in supply chains, trade dynamics

Enterprise - Brand

Company Social Media Net

Company VIETNAMNAY

Company HANEL MIROLIN

Company Keangnam - vina

Company HP Travel

Company Keloph